3 minute read
A homeowner builds a beautiful deck around their pool, then a pool inspection or a pre-sale inspection flags it as non-compliant. Now they are rebuilding the balustrade on a deck that was finished months ago. Pool-deck non-compliance is the single most commonly flagged decking issue at inspection in South Australia, and it is almost always avoidable.
Here is why pool decks fail, and how a builder who knows pool-zone work designs the failures out before a board is fixed.
The rule that applies
Any deck within 1.2 metres of a pool is treated as part of the pool barrier system. That brings the Swimming Pools Act 1968 (SA) and AS 1926 into the deck design. A pool deck is not a normal deck plus a fence - it is a deck that has to satisfy pool-safety law as part of its structure.
When a pool deck fails inspection, it is usually one of four things.
Failure 1: the barrier is under 1.2 metres
The pool fence or barrier must be at least 1.2 metres high. A deck balustrade that doubles as the pool barrier and was built to the ordinary 1 metre deck-balustrade height fails. The barrier height for a pool deck is 1.2 metres, not 1 metre, and that has to be designed in from the start.
Failure 2: the non-climbable zone is breached
A 900 millimetre non-climbable zone must be kept clear on the pool side of the barrier. Nothing within that zone can act as a foothold for a small child climbing the barrier. The classic breaches are a wide top rail a child can stand on, a built-in bench against the barrier, or a planter box positioned as an unintended ladder.
A deck designed without the non-climbable zone in mind puts features exactly where a child could climb. A deck designed with it keeps the zone clear.
Failure 3: a non-compliant gate
Pool-zone gates must be self-closing and self-latching, with the latch 1.5 metres above the ground. A gate that does not self-close, does not self-latch, or has a latch within a child's reach fails.
Failure 4: a slippery surface
A pool deck is regularly wet, and the surface needs slip resistance under AS 4586. A smooth board that becomes slick when wet is both a safety risk and a compliance issue.
How a builder designs the failures out
Every one of these is cheap to design in and expensive to retrofit. A builder experienced in pool decks sets the barrier at 1.2 metres, plans the non-climbable zone before placing any rail, bench or planter, specifies compliant gates, and chooses a slip-resistant surface. None of it costs extra beyond the items themselves - it is simply part of designing a pool deck properly.
Retrofitting after a failed inspection is the expensive path. Bringing an existing non-compliant pool-deck barrier up to AS 1926 costs $3,500 to $11,000 - money spent fixing a deck that should have been compliant the first time.
Coastal pool decks have one more requirement
If the pool deck is near the coast - Holdfast Bay, Onkaparinga, Port Adelaide Enfield - it is constantly wet and exposed to salt air. It needs 316 stainless or class 4 galvanised fixings, or the structural connections corrode.
The takeaway
A pool deck that passes inspection is a pool deck where the compliance was designed in from day one by a builder who has done it before. When you compare 3 quotes for a pool-surround deck, ask each builder how they handle the 1.2 metre barrier, the non-climbable zone and the gate. The builder who answers confidently has built compliant pool decks. The one who hesitates will build you a deck that fails.